Matillion ETL 1.78 LTS, released May 29th 2025, has an end-of-support date of November 2026 and is listed as currently supported.

15days until November 2026
Act by
Jul 4, 2026
window passed: act now

+ Add Matillion dates to calendar

Who’s affected

Teams running Matillion ETL version 1.78 LTS, which is the only plan listed in the record. They need to plan an upgrade or move before support ends in November 2026.

Not affected: Teams on a different Matillion ETL release or a different Matillion product. Anyone already scheduled to upgrade off 1.78 LTS before November 2026.

What it costs

The record gives no prices, so there is no direct license change. The cost is upgrade or migration effort and testing, plus the risk of running unsupported software after the end-of-support date.

Run the End-of-support runway →

When to act

The effective date is about two weeks away (assumed 1 Nov 2026, as only the month is stated), so start now; migrations off end-of-support versions typically need 120-180 days of lead time.

Blast radius: Scheduled Matillion jobs, orchestration, and any downstream dbt models or dashboards that depend on their loads. Unsupported software may also raise security and audit flags.

What should you do? decision tree

  1. you are on Matillion ETL 1.78 LTS and have not confirmed the exact support end day
    Ask Matillion or your account rep for the precise date, since the source states only the month and we assumed the 1st.
  2. A newer supported Matillion ETL release is available to you
    Schedule the upgrade in a non-production environment first, then run your critical jobs and promote.
  3. you cannot upgrade before the end-of-support date
    Ask Matillion about extended support or a written exception, and document the risk for security and compliance owners.
  4. you are already considering leaving Matillion
    Use this deadline to scope a migration of pipelines to another tool and run it in parallel with the current setup.
  5. none of the above applies
    Keep running 1.78 LTS with a documented risk acceptance, freeze changes, and set a firm upgrade date.

Options

Alternatives editorial picks, not sponsored

dbt LabsSQL transformation in the warehouse; fits teams replacing in-tool transforms.
CoalesceWarehouse-native transformation with a visual, column-aware workflow.
FivetranManaged ingestion connectors; fits teams that mainly use Matillion for loading.

The facts straight from the source

Vendor / product
Matillion · Matillion ETL 1.78 LTS
Change
End of support
Effective
November 2026
Only the month of end of support is stated in the source; day assumed as 1st.
Plans affected
1.78 LTS
Source
docs.matillion.com
Evidence
“1.78 LTS May 29th, 2025 November 2026”

Date as quoted: “November 2026”

Facts above are extracted from the source and checked word-for-word before publishing. The guidance sections are AI-assisted analysis based only on those facts: a starting point, not legal or procurement advice. Spotted an error? Tell us.

Related changes

Get the weekly brief

Get the Monday brief →One email a week: what changed in the data stack and whose clock is running.